19:27
can you devine mino remodeling
Ed Emond
19:48
can you define minor remodeling
McKenzie Snow
21:11
"Please note that some HVAC upgrades may constitute “minor remodeling” and the Department’s applicable regulations regarding construction at 34 CFR §§ 76.600 and 75.600-75.618 would not apply. Minor remodeling means minor alterations in a previously completed building, for purposes associated with the coronavirus. The term also includes the extension of utility lines, such as water and electricity, from points beyond the confines of the space in which the minor remodeling is undertaken but within the confines of the previously completed building. The term does not include permanent building construction, structural alterations to buildings, building maintenance, or repairs. However, minor remodeling projects that constitute capital assets under the Uniform Guidance still require prior approval consistent with 2 CFR 200.439."
slee
21:13
What if I am self preforming certain projects (window balances). Does this still follow these guidelines
Ed Emond
22:21
when are we going to have project specifications reviewed
Fred Reagan
22:58
Does the project review by the nh division of historic resources apply with window replacement?
Fred Reagan
23:02
Fred
bbeasley
23:14
Is parking lot re-design permitted with ESSER III?
Kyle Repucci
25:47
Where will the link to this recorded meeting be located for future reference?
James Fenn
27:09
Three weeks ago I submitted 12 different Proposed ESSER Funded Construction Project sheets for preliminary conceptual approval of projects. I have not heard anything back from NHDOE on these. Any idea when you will address them? I cannot begin the engineering on them until you have and our window is getting shorter every day to design and complete these projects.
Mary Henry
27:22
Should we attach our contracts in the grants system?
Robert Gadomski
28:04
Since we have already received preliminary approval for our project in Somersworth through GMS, does this fulfill the requirement in step 1 of conceptual approval?
Ed Emond
28:54
the Historical review and the fire marshal review will likely kill any ability to get our projects done this summer.
Mary Henry
31:19
They are not signed contracts.
Mary Henry
32:58
They are ready to be signed.
CZappala
33:27
We have projects beginning next week. Can we complete the projects and then submit for approval and reimbursement retroactively?
Ed Emond
33:27
if its minor remodeling then it is exempt
Jessica Lescarbeau
34:01
Mary, you can send the contract to our Bureau email (at the top of the chat) and we can review as Tim stated from a compliance standpoint and provide comments.
slee
38:28
We currently have been upgrading our HVAC building automation system, it's being preformed by a small one man contractor. Does that require Davis Bacon as well?
Scott Gross
38:48
Will you notify us as to Katie Murphy's replacement?