Churchill Park Master Plan - Phase 2 Information Session
The City of Hamilton’s Landscape Architectural Services section has started the design of Phase 2 of the Churchill Park Master Plan Implementation. In keeping with the approved Master Plan, the Phase 2 project will focus on drainage and pedestrian accessibility in the north end of the park. Please refer to the attached Ph. 2 Concept Plan and the description of work below:

Installation of limestone screening walkways on the upper plateau (soccer field area) including formal connections to Royal Botanical Gardens (RBG) trail heads (Ginger Valley
Trail and Princess Point Trail) and connections to phase 1 walkways.Re-grading of the existing cricket pitch area.

Installation of grassed swales and small-scale rain gardens.

Shifting 2 mini soccer pitches east to permit small rain garden installation and improve sports field drainage.

Installation of stone seating nodes at Franklin Ave. and Norwood Road walkway intersections